The project involves optimising and redesigning the BRT Core Line 3 from Kenyatta Hospital to Dandora Commuter Railway Station, which traverses densely populated urban areas of Nairobi City, including parts of the CBD, Juja Road and Komarock Roads.
Bus Rapid Transit Core Line 3
Nairobi | Kenya
Dates: 07/2020 – 03/2022
Client: Nairobi Metropolitan Area Transport Authority (NaMATA)
Project Cost (EUR million): 300
Value of Services (EUR million): 0.4
Project Preparation Consultancy for Implementation of the Core Line 3 BRT in Nairobi (12.4 km)
Services
- Under the leadership of Ramboll (main consultant) we had the full responsibility for the design of the BRT lanes, pavement, stations, drainage, junctions, traffic modelling, as well as structures and flyovers.
- Detailed engineering designs and technical specifications of all BRT infrastructure (civil, architectural, structural, and electromechanical)
- Preparation of tender documents for Design & Build works packages (FIDIC Yellow Book)
- Confidential Costs Estimates
- ESIA/ RPF/ RAP
- Project Implementation Plan