Detailed engineering studies including the design of BRT lanes, general traffic lanes, non-motorized transport facilities, pedestrian foot bridges and other structures, as well as street lighting and drainage and ancillary works. The project complements the planned development of Commuter Rail Service along Jogoo road.
Bus Rapid Transit Line 4
Nairobi | Kenya
Dates: 06/2014 – 06/2015
Client: Ministry of Transport and Infrastructure
Funding: African Development Bank
Project Cost (EUR million): 80
Value of Services (EUR million): 1.14
Detailed Engineering Studies and Design of BRT Line 4 on Jogoo Road corridor (17.2 km)
Services
- Data collection, surveys, analysis & evaluation (traffic, route alignment, geographical and topographical) and development of the long term traffic demand forecast
- Institutional, legal and regulatory framework
- Detailed Engineering Study for BRT initial phase
- Environmental and Social Impact Assessment / Resettlement Action Plan
- Financial and economic analysis, and Business and operation plan
- Tender documents and confidential cost estimate
- Project Implementation Strategies, Construction Methods and Scheduling
- Capacity Building and Training.